Blog
Articles on visitor management and site safety
Practical guides to visitor check‑in, contractor inductions and site access.
BlogMore than half arrive before 10 a.m.: a year of check‑in data13 October 2026 · 3 min readOver 10,000 kiosk check‑ins in 12 months: 57% of the day's people arrive before 10 a.m., and only 1.6% were pre‑registered.
BlogAccess cards for staff, a paper log for contractors: what we saw at 94 plants13 October 2026 · 3 min readEmployees use an access card, contractors and visitors sign a paper log. What we saw at 94 plants, and what international studies show.
BlogFive questions about your site entry, and how other plants answered them13 October 2026 · 3 min readWho staffs the gatehouse, where contractors sign in, and whether you can prove their induction within a minute. How plants on our calls answered.
BlogWhat is contractor management? From invitation to exit at your site11 October 2026 · 4 min readContractor management covers external firms from invitation to exit: documents, site risk acknowledgment, safety induction, entry and the record for audits.
BlogSigned risk acknowledgments get lost in the emails after signing10 October 2026 · 3 min readPlants do get risk acknowledgments signed by their contractors. The signed version gets lost afterwards, in emails and binders. How Model Obaly in Opava solves it.
BlogThe contractor induction signature you can't find in the binder10 October 2026 · 3 min readAfter a contractor's accident, someone searches the binder for their induction signature, and often it isn't there. How Artifex handles 73+ inductions a month.
BlogYour roll call is only as accurate as your departure records10 October 2026 · 3 min readAt the assembly point, people look for workers who left hours ago. A roll call is accurate where a turnstile or card collector records the exit.
BlogA faster gatehouse won't clear the truck queue at your gate10 October 2026 · 2 min readThe morning queue at the gate doesn't go away with a faster gatehouse. It goes when drivers wait elsewhere and an SMS calls them to the dock.
BlogA visitor log is only as accurate as the busiest shift at the gatehouse29 September 2026 · 3 min readThe visitor log holds up during the day. The gaps appear at rush hour and at night. How Artifex checks in 220+ visitors a month the same way every time.
BlogWorkplace safety 2026: the contractor record starts at the gate10 March 2026 · 3 min read2026 brought contractors no new paperwork. It brought the question of who was on site when, with which induction. The answer has to start at the gate.
See how aReception would work at your site
In 15 minutes, we'll show you visitor check‑in, contractor inductions and the overview of who is on site.
Got it. We will get back to you within one business day.
In the meantime, watch a one‑minute video from a live site.
Pick a time now






